The Gara project in the Loulo gold field of Mali. Loulo includes the Gara, Yalea and Gounkoto deposits. Loulo is about two kilometres east of the border with Senegal (marked by the Falé river) on the West Mali gold belt. Image credit: BBE

Loulo cools down to maintain sustainable gold output 

Société des Mines de Loulo (SOMILO), owned by Barrick Gold (80%) and the Government of Mali (20%), has commissioned another surface refrigeration plant at the Loulo gold field on the West Mali gold belt.

Loulo is expanding its mining operations to maintain current gold output. Additional infrastructure, which includes the new refrigeration plant, will enable the expansion, and ensure sustainable production.

South African based Bluhm Burton Engineering (BBE) Projects has been awarded the contract to commission the turnkey surface refrigeration plant Mali.

The Loulo gold field, which includes the Gara, Yalea and Gounkoto deposits is less than two kilometres east of the border with Senegal (marked by the Falé river) on the West Mali gold belt.

The evolution of Loulo (Loulo cools down to maintain sustainable gold output)

SOMILO is an exploration and mining company and the owner of the Loulo gold mine, which in turn is owned 80% by Barrick Gold and 20% by the state of Mali.

Gold potential was first recognised by Syndicat Or joint venture between the Malian Direction Nationale de la Géologie et des Mines and the French Bureau de Recherches Géologiques et Minières (BRGM).

The Gara gold deposit was discovered in 1981 by the Syndicat Or joint venture. In 1992, BHP Minerals Mali entered into an agreement with Société des Mines de Loulo for a joint venture that developed the Gara deposit into a Mineral Resource that was deemed sub-economic at the time.

During 1996, Randgold Resources acquired BHP Minerals Mali and undertook additional regional exploration, which resulted in the discovery of Yalea in 1997, the second of two deposits that make up Loulo Mine.

In 2003, a feasibility study was undertaken at Loulo on a 12 Million tonne (Mt) at 3.60 grams per tonne (g/t Au) for 1.4 Million ounces (Moz) Ore Reserve, which led to the construction of an open pit mine in 2004.

Production from Loulo mine started in 2005 as an open pit operation. The Loulo underground mine passed through the feasibility study stage in 2005, with development beginning in 2006. The first gold produced from Yalea underground was in 2008 and Gara underground in 2011.

Randgold Resources merged with Barrick Gold in 2018/2019. This mega-merger created the world’s biggest gold miner by market capitalisation. The merger was required to pool the companies’ resources to stay competitive in the industry.

Finding solutions for Loulo’s challenges (Loulo cools down to maintain sustainable gold output)

Open pit mining commenced in 2005 and soon thereafter the team started looking at the construction of an underground mine. The Loulo ore body is relatively shallow. The mine is located at a low altitude in an equatorial region and thus experiences extreme humidity and heat throughout the year.

These challenging climate conditions necessitated the turnkey construction and commissioning of a refrigeration plant at both Gara and Yalea dedicated downcast ventilation holes, in 2016, to cool the underground workings.

Since 2016, both the Gara and Yalea underground mines have expanded production towards the south requiring further underground cooling.

Solutions for hot conditions (Loulo cools down to maintain sustainable gold output)

An independent mine ventilation consultant prepared and issued an enquiry on behalf of SOMILO for a turnkey contract to build a 14MWR refrigeration plant at both Gara and Yalea dedicated downcast ventilation holes, in 2015.

The BBE tender covered all technical, commercial and statutory requirements laid out in the enquiry documents and BBE Projects was awarded the turnkey contract by means of competitive tender, after a few rounds of technical and commercial queries.

During the execution of the project, BBE Projects carried out detailed design, procurement, manufacturing, quality control, shipping, delivery, construction, erection, installation, supervision, project management, commissioning, testing, certification and hand-over of the refrigeration plants.

In a similar manner, SOMILO awarded BBE Projects a second turnkey contract to build a refrigeration plant at the Yalea South dedicated downcast ventilation hole in 2021.

This time SOMILO requested that all equipment supplied by BBE Projects must be compatible and interchangeable with the existing refrigeration plants to minimise spares holding and to allow the mine to implement the same corrective and preventative maintenance schedules used at the existing plants.

The new refrigeration plant capacity is 8MWR and is smaller than the existing refrigeration plants, but with space reserved and design provisions made to expand the refrigeration system in future if required.

The new refrigeration plant also has many improvements compared to the existing plant. These innovations were brought about during meetings and consultation with mine employees that maintain and operate the refrigeration plants.

The most notable innovation is the five-metre diameter steel inlet duct that connects the bulk air cooler to the dedicated downcast ventilation hole complete with a self-closing door positioned directly above the shaft to relieve shockwaves that occur during certain times of day due to blasting underground.

The damper blades are of a relatively light construction allowing the blades to open with little pressure and close using adjustable counterweights.

The refrigeration machine is an 8MWR dual-compressor York YD with R134a refrigerant, housed in a plant room erected from steelwork that was designed, shop detailed and fabricated in South Africa.

Dual compressors were selected to halve the maximum instantaneous start-up current of the refrigeration machines thereby mitigating the possibility of de-stabilising the mine’s power grid. The mine generates its own power by means of diesel generators and solar plants on site for mining operations.

The Bulk Air Cooler (BAC) is adjacent to the plant room, minimising interconnecting piping and thermal losses. The BAC basin is constructed from reinforced concrete with insulated panel side walls and roof to speed-up construction time, reduce time spent working at heights and increase thermal efficiency of the spray chamber. Similarly, the Condenser Cooling Tower (CCT) used for heat rejection is constructed from lightweight Fibreglass-Reinforced Plastic (FRP) components with similar benefits in cost, time and safety. Furthermore, FRP is a good alternative to concrete because of its high strength, lightweight and stability.

Success and unique challenges (Loulo cools down to maintain sustainable gold output)

All civil, structural, mechanical and piping works were carried out by local contractors in line with the mine’s commitment to drive socio-economic development and training. Site construction, erection and assembly was supervised by BBE Projects with regular inspections by discipline specific engineers from BBE and OEMs.

Equipment for the refrigeration plant was sourced and shipped from all over the world. CCT fans and electrical motors from Brazil, FRP CCT structure and header piping from India, FRP CCT fan stacks from Poland, CCT gearboxes from Belgium, FRP CCT Cladding from Turkey, refrigerant from Dubai and the refrigeration machines from USA.

The balance of the mechanical equipment (pumps, plant room crane, valves, piping, fasteners, etc.), EC&I equipment (transformers, MV Switchgear, MCC, cables, instrumentation, etc.) and civil material and structural steelwork (rebar, plant room steelwork, shaft inlet ducting, pipe supports, etc.) were consolidated and shipped from South Africa.

The construction of the refrigeration plant also came with a unique set of challenges such as changing the shipping route from Dakar port to Guinea port midway through the project because ECOWAS (Economic Community of West African States) imposed sanctions on Mali. Other challenges included delays due to storms at Durban port, and a major supplier going into liquidation (fortunately only near the end of the manufacturing process).

BBE Projects is currently working on the Gara South Refrigeration plant that will be commissioned later this year, and the project is on track for completion in the third quarter of 2023. Once complete, the refrigeration system will enable mining in the largely untapped southern area of the orebody, extending the life of mine significantly.

Loulo cools down to maintain sustainable gold output

WhyAfrica provides on the ground information and business intelligence about the sustainable utilisation and extraction of natural resources in Africa, and can assist your company through:  

  1. Membership:
  • WhyAfrica’s membership offers great business insights to you, your company, and clients.
  • Amongst many other benefits, we will publish editorial content about you or your company on the WhyAfrica online platform and on all WhyAfrica’s social media pages – the annual fee is R5,500 and you can find out more or subscribe here: https://www.whyafrica.co.za/product/membership/ 
  1. Sponsorship:
  • WhyAfrica’s annual 45-day African Road Trip takes place in July and August. We will visit more than 30 project sites and this year we plan to visit the Limpopo Province of South Africa, Zimbabwe or Botswana, Zambia, Malawi, Tanzania, and Kenya. Sponsoring the Road Trip, or to be a WhyAfrica member, gives you unparalleled insight into the business environment of the countries that we travel to and the project sites we visit.
  • To be a member or sponsor allows you access to invaluable, on the ground, business intelligence and a great marketing opportunity for all companies doing business in Africa.
  • The main aim of our Road Trips is to promote Africa as an investment destination and to showcase Africa’s greatest companies, and projects to our large global audience, which includes a list of potential investors, venture capitalists and serial entrepreneurs.
  • To view the photos of last year’s Southern Africa Road Trip click on the gallery link or follow our Instagram account at why.africa https://www.whyafrica.co.za/road-trips/whyafrica-road-trips/. 
  1. Advertising:
  • We publish daily online articles on our WhyAfrica platform and post them on social media every day. Our combined online reach is more than 45,000. In-article banner ads are highly successful advertising tools as is advertising space on our website.
  • In addition to our bi-weekly newsletters, we publish two printed- and two interactive digital magazines per year. The printed magazines are distributed at major events and conferences throughout the year, and also on our WhyAfrica Road trips.
  • Digital magazines are e-mailed to all our subscribers and shared on our social media platforms. A copy of the latest edition is automatically attached to all our outgoing e-mails.
  • WhyAfrica magazines provide great marketing opportunities. There are also in-article and on-line advertising opportunities at exceptional rates. Contact me for more information on leon@whyafrica.co.za or give me a call.
  • To subscribe to WhyAfrica’s free newsletters and magazines click on the link and register: https://www.whyafrica.co.za/subscribe/  
  1. 4. Partnerships
  • Maximise your African exposure and link with our large business network through becoming one of only 10 WhyAfrica partners. We have only five prime partnership positions left for 2023, so contact me at leon@whyafrica.co.za before the end of March to get the best deal.

Loulo cools down to maintain sustainable gold output

Share Article

Sectors

AgricultureEnvironmental Management & Climate ChangeEnergyESGInfrastructureMiningPolitical EconomyTourism and ConservationWater Management