Appearing as cracks, honeycombing and areas with exposed aggregate and reinforcing, cold-joint lifts prevent a strong, water-tight bond between the layers in the reservoir wall. Image credit: Cement & Concrete SA

Africa needs concrete reservoirs to last 100-years

Africa needs concrete reservoirs that are designed, built and maintained to last for at least 100 years.  

There is no reason that an appropriately designed, built, and maintained concrete reservoir should not continue adding value for at least 100 years.

This is considering the durability of concrete which enables it to resist many deleterious effects while maintaining its desired engineering properties.

This is according to renowned materials specialist, Dr Rod Rankine. Dr. Rankine addressed cement and concrete industry stakeholders at Cement & Concrete SA’s (CCSA) Concrete Working for Water Roadshow in South Africa recently.

The well-attended events in Johannesburg, Durban and Cape Town brought together leading local built environment professionals to find solutions to South Africa’s dire water crisis.

Also offering cost-savings for the initial build and maintenance later on, concrete will no doubt continue to play a central role in the country’s water-augmentation strategies.

However, Dr Rankine noted that it is important that South African engineers, contractors, sub-contractors, and participants in the civil-engineering construction supply chain ensure that concrete water infrastructure realises its full potential. This relies on best practice in terms of construction; quality control; structural design; and detailing.

Built to last 100-years (Africa needs concrete reservoirs to last 100-years)

“When we design and build new reservoirs, it should be done so well that they last as long as possible, which is at least a century. This is not unusual for an appropriately maintained concrete reservoir that has been delivered to the highest possible quality standard,” Dr Rankine said.

He expressed deep concerns about a rapid decline in the quality of the design and construction of concrete water retaining structures in municipal jurisdictions. He showed delegates examples of concrete reservoirs in various stages of construction that would never be able to function.

In some instances, concrete construction design and application was so poor that these partially completed and final structures would have to be demolished and rebuilt entirely.

Others required large concrete repairs, also costly and disruptive to service delivery. The situation places additional strain on already-stretched municipal resources, exacerbating the serious water crisis with which the country currently grapples.

Dr Rankine noted that appropriate concrete design and construction, which included adequate measures to prevent corrosion of steel reinforcing, would save asset owners significantly in major repairs further down the line.

He cited Prof Walter de Sitter’s, “Rule of Five” to demonstrate his point. According to De Sitter’s Rule of Five, R1 invested during the design and construction of reservoirs is equivalent to R5 after the structure has been built, but corrosion is not yet evident; R25 when corrosion has started at some areas; and R125 when corrosion has become widespread, and rehabilitation is required.

For example, a concrete reservoir that has been built with reinforcing steel that has been hot dip galvanised according to the SANS 121 specification will last three times longer than a similar water-retaining structure that has been constructed with black rebars.

This justifies the additional expenditure in hot dip galvanising.  There is currently no other method that safeguards against reinforcement corrosion, the leading cause of failure of reinforced concrete structures, than hot-dip galvanising.

The weakest link (Africa needs concrete reservoirs to last 100-years)

Despite the availability of such state-of-the-art technologies that improve the performance of concrete and the already many proven benefits of concrete, defective reservoirs are still being constructed on behalf of South Africa’s municipalities.

The reservoirs inspected by Dr Rankine mainly leak through cold-joint lifts, which he described as the “weakest link” in concrete water-retaining infrastructure and where reinforcing bar starts to corrode first.

Cold-joint lifts are a necessity, but they are inevitably a weak point because the concrete at the top of the previous lift is of inferior quality as a result of bleeding.

Honeycombing at the bottom of walls, adjacent to joints between form panels and at cold-joints is a problem is a common cause of inherent weakness and deficiency which continues to bedevil this industry.  It can all be attributed to a poor understanding of concrete technology and poor site practice.

Appearing as cracks, honeycombing and areas with exposed aggregate and reinforcing of various sizes, they prevent a strong, water-tight bond between the two layers in the reservoir wall.

The large areas of honeycombing that Dr Rankine have observed time and again are as a result of poor compaction practices and incomplete placement of concrete in formwork.

Inconvenient truths (Africa needs concrete reservoirs to last 100-years)

He told delegates during his session at CCSA’s Concrete Working for Water that it was clear that sound concrete compaction practice was largely being ignored by contractors appointed to work on these projects.

However, the onus also lies with resident engineers supervising the works.  “There are some inconvenient truths when it comes to proper concrete placement that need to be heard by the companies that were appointed to build these reservoirs.

Firstly, there is no such thing as self-levelling concrete and pumped concrete is certainly not self-compacting. Secondly, there are limits to the amount of concrete that a single concrete vibrator can vibrate in an hour and at least three workers are required to operate it,” he said.

Because the natural packing density is interrupted by shutters, the flat floor and struck-off top, porosity near the top and bottom of the reservoir walls surveyed by Dr Rankine is 0,30 Porosity Units (pu).

Near the surface, porosity is less than 0,48pu due to interruption of the natural packing density by the flat shutter. In the centre portion of the reservoir walls where natural packing density is optimal, porosity is 0,26pu.  Thus, the paste requirement near defined edges is aways higher.

This would not have occurred if greater care had been practiced when placing the pumped concrete in the deep forms by using an elephant truck or hydro-valve, Dr Rankine noted.

Dismal state of reservoirs (Africa needs concrete reservoirs to last 100-years)

Meanwhile, the many vertical cold joints that he had analysed were as result of working in one direction on closed-circuit structures. Rather, seasoned contractors know that best practice is to place concrete by starting with two teams at one position and then working in opposite directions so that when they meet, they can join fresh concrete to fresh concrete, when constructing a reservoir wall to avoid this problem.

Dr Rankine was also concerned about high incidences of inadequate concrete cover that he has noticed. This is considering the very large part that concrete cover plays in concrete durability. He said that contractors had one chance to get it right but, disappointingly, were failing to do so judging by the dismal state of the reservoirs that he was asked to inspect.

Grout loss between adjacent shutters was also a cause of honeycombing on these water-retaining structures. As he explained, a lot of grout was being lost due to “leaky formwork”. Skilled and experienced contractors, therefore, ensure tight joints and sometimes use self-adhesive compressible foam gaskets to successfully retain the grout between the adjacent shutters.

He also identified incorrect application of and, in some instances, over reliance on hydrophilic waterstops as a recurring problem. Installed across concrete joints, they also often become misaligned and are damaged when casting adjacent concrete panels. “For a hydrophilic waterstop to work as intended, it has to be coaxially confined. Many contractors have been coerced into using these just because they exist, whereas an excellent watertight joint can be achieved without a hydrophilic strip,” Dr Ranken said.

Furthermore, he identified problems in the correct design and installation of bearing pads, which play a critical role in transferring loads to the foundation of the structure and facilitating movement. A case in point was the severe load- and movement-related cracking of a reservoir wall founded on a Kilcher-type polytetrafluoroethylene bearing with bandage seal between the inside wall and floor.

Dr Rankine also clarified misunderstandings around the allowable size of cracks in a reservoir wall for autogenous healing purposes. Widely regarded as a conservative standard, EN 1992-3-2006 provides for autogenous healing by limiting the ratio of hydrostatic head-to-wall-thickness to a maximum allowable value of 35 for crack widths not exceeding 0,05mm.

However, as he noted, this is not practical or realistic. Dr Rankine said that cracks that do not exceed 0,3mm in width will almost certainly seal themselves with time. Calcium hydroxide (Ca (OH)2), a by-product of cement hydration, from within concrete is conveyed by leaking water to the dry side of the wall. Thereafter, it evaporates and the Ca(OH)2 is deposited on the dry face as a precipitate. This then reacts with atmospheric carbon to form calcite sealing the cracks.

Africa needs concrete reservoirs to last 100-years

ADVERTISEMENT

WhyAfrica provides on the ground information and business intelligence about the sustainable utilisation and responsible extraction of natural resources in Africa, and can assist your company through:  

  1. Membership:
  • WhyAfrica’s membership offers great business insights to you, your company, and clients.
  • Amongst many other benefits, we will publish editorial content about you or your company on the WhyAfrica online platform and on all WhyAfrica’s social media pages – the annual fee is R6,500 and you can find out more or subscribe here: https://www.whyafrica.co.za/product/membership/ 
  1. Sponsorship:
  • WhyAfrica’s Road Trip takes place annually in July and August. During our Road Trip we aim to visit more than 30 project sites. Sponsoring the Road Trip, or to be a WhyAfrica member, gives you unparalleled insight into the business environment of the countries that we travel to and the project sites we visit.
  • To be a member or sponsor allows you access to invaluable, on the ground, business intelligence and a great marketing opportunity for all companies doing business in Africa.
  • The main aim of our Road Trips is to promote Africa as an investment destination and to showcase Africa’s greatest companies, and projects to our large global audience, which includes a list of potential investors, venture capitalists and serial entrepreneurs.
  • To view the photos of this year’s Southern Africa Road Trip click on the gallery link or follow our Instagram account at why.africa https://www.whyafrica.co.za/road-trips/whyafrica-road-trips/. 
  1. Advertising:
  • We publish daily online articles on our WhyAfrica platform and post them on social media every day. Our combined online reach is more than 45,000. In-article banner ads are highly successful advertising tools as is advertising space on our website.
  • In addition to our bi-weekly newsletters, we publish two printed- and two interactive digital magazines per year. The printed magazines are distributed at major events and conferences throughout the year, and also on our WhyAfrica Road trips.
  • Digital magazines are e-mailed to all our subscribers and shared on our social media platforms. A copy of the latest edition is automatically attached to all our outgoing e-mails.
  • WhyAfrica magazines provide great marketing opportunities. There are also in-article and on-line advertising opportunities at exceptional rates. Contact me for more information on leon@whyafrica.co.za or give me a call.
  • To subscribe to WhyAfrica’s free newsletters and magazines click on the link and register: https://www.whyafrica.co.za/subscribe/  
  1. 4. Partnerships
  • Maximise your African exposure and link with our large business network through becoming one of only 10 WhyAfrica partners. We have only five prime partnership positions left for 2023, so contact me at leon@whyafrica.co.za to get the best deal.

Africa needs concrete reservoirs to last 100-years

 

Share Article

Sectors

AgricultureEnvironmental Management & Climate ChangeEnergyESGInfrastructureMiningPolitical EconomyTourism and ConservationWater Management